Duty, delta and base period

  • Delta (Δ): total depth of water a crop needs over its base period.
  • Duty (D): area irrigated per cumec of continuous flow (ha/cumec).
  • Base period (B): days from first to last watering.
  • Relation: Δ = 8.64 B/D (Δ in m, B in days, D in ha/cumec).
  • Duty is higher at the field than at the canal head (losses on the way).
  • Crop period ≥ base period.

Water requirement

  • Consumptive use (CU): evapotranspiration + water in plant tissue. Net irrigation requirement = CU − effective rainfall.
  • Field irrigation requirement = net requirement / application efficiency; gross = field requirement / conveyance efficiency.
  • Efficiencies: conveyance, application, storage, and uniformity (distribution).

Soil moisture: field capacity (water held after free drainage), permanent wilting point, and available moisture = FC − PWP. Water depth to apply:

d = (γ_d/γ_w) D (F_c − m₀), with D = root depth and m₀ the moisture content at which irrigation starts. Frequency = d/(daily consumptive use).

Canal design: silt theories

Kennedy's theory: critical velocity V₀ = 0.55 m y^0.64 (m = critical velocity ratio); trial and error with Kutter's formula.

Lacey's regime theory:

  • Silt factor f = 1.76 √d (d = particle size in mm).
  • Velocity: V = (Q f²/140)^(1/6).
  • Hydraulic radius R = (5/2)(V²/f); wetted perimeter P = 4.75 √Q.
  • Regime slope S = f^(5/3)/(3340 Q^(1/6)).

Canal structures

  • Weirs and barrages on permeable foundations: Bligh's creep theory (creep length L = C × H, safe if the hydraulic gradient H/L ≤ 1/C) and Khosla's theory (uplift pressures from the potential flow; exit gradient G_E = (H/d)(1/(π√λ))).
  • Cross-drainage works: aqueduct (canal over drain), super-passage (drain over canal), syphon, level crossing.
  • Canal falls, regulators, outlets (modular, semi-modular).

Worked example

A crop has B = 120 days and duty 1728 ha/cumec at the field.

  • Δ = 8.64 × 120/1728 = 0.6 m.

Practice

GATE-styleNAT · numerical answer

The delta of a crop is 1.2 m and its base period 100 days. What is the duty in ha/cumec?

Show answer and explanationAnswer: 720

D = 8.64B/Δ = 864/1.2 = 720 ha/cumec.

GATE-styleNAT · numerical answer

By Lacey's theory, what is the wetted perimeter (m) of a regime canal carrying 64 m³/s?

Show answer and explanationAnswer: 38

P = 4.75√Q = 4.75 × 8 = 38 m.

GATE-styleNAT · numerical answer

Root zone depth 1 m, field capacity 30%, irrigation starts at 18%, dry unit weight of soil 15 kN/m³ (γ_w = 10). What depth of water (mm) should be applied?

Show answer and explanationAnswer: 180

d = (γ_d/γ_w) D (F_c − m₀) = 1.5 × 1 × 0.12 = 0.18 m = 180 mm.

GATE-styleMCQ · one correct answer

A cross-drainage work where the canal passes over a natural drain, with the drain flowing freely below, is called:

Show answer and explanationAnswer: A

In an aqueduct the canal is carried over the drain; in a super-passage the drain passes over the canal.